Bionetics)
captionsby Sherikon Gap Systems (Paula Shawa, Susan Walsh and Block
Weirauch)
category SHUTTLE.sts-71
date 20-Mar-1995
description The STS-71 Spacelab-Mir part is lifted by overhead hoist from a
test stand in the Operations and Checkout (O&C) Bungalow after
take checkout work is extensive by the KSC goods running
consortium. the part movement be incorporated now the goods bay of the
Gap Shuttle orbiter Atlantis. Dressed in the 11-day order, the
part movement event as an orbital medical laboratory everywhere link
U.S.-Russian investigations movement be conducted on the
physiological equipment of long-duration spaceflight. Equally on stall
Atlantis movement be the Orbiter Docking Mechanism (ODS) that movement
concur the link-up of Atlantis and the Russian Mir Gap Spot.
STS-71 is the first of seven on purpose docking missions. The
Spacelab-Mir after that carries necessities for the two Russian Mir 19
groove members who movement liftoff as a partition of the STS-71 groove and
sophisticated redeploy now the space station.
highres 800 x 554
highsize 115599
hightype JPEG
keywords SHUTTLE,sts-71
lasteditor J.
Dumoulin
lowres 320 x 221
lowsize 64910
lowtype GIF
mediumres 800 x 554
mediumsize 115599
mediumtype JPEG
number KSC-95PC-0443
scannedby NASA/KSC Internet Lab (Dumoulin, Downs))
slideres 172 x 151
slidesize 37447
slidetype GIF
tinyres 100 x 69
tinysize 10525
tinytype GIF
title Spacelab-Mir Way Make off with in Operations and Checkout Bungalow,
0 comments:
Post a Comment